What elevation is the top of the curb at the south east corner of Broadway and Sossaman? What is the difference between the circle & square symbols on Sheet 19?
This workshop is intended to provide initial exposure to interpreting civil drawings. We will use the Broadway Road Improvement Project from Mesa, Arizona. The complete set of drawings is not provided but a selective sample of 19 sheets is available. Please answer the following questions taken from the drawings.
Where is the main Brass Tag Benchmark? And what is its elevation?
How wide are the bike lanes at STA 159+00?
What elevation is the top of the curb at the south east corner of Broadway and Sossaman?
What is the difference between the circle & square symbols on Sheet 19?
At Station 151+50 how wide are the PUE’s on both sides of the roads? And how far are they from the centerline of Broadway Road?
How many Lighting Control Cabinets will be installed on the south side of Broadway between stations 143+00 and 152+00?
Approximately what is the distance from the top of the curb to the existing grade at Station 143+10?
How many Cascalote Trees will be located near the Underground Cable TV line between stations 32+00 and 35+00 of Sossaman Road?
How many existing Traffic Signs will need to be relocated?