Demonstrate an ability to track changes associated with a project or package of work.

Construction Project Based Learning

A structured report 1500 words (+/- 10%) to explain the steps you have taken to track a project or a sub contract package, depending on the value of the overall project.

Evidence from the project will be required to support your analysis (Clearly anything commercially sensitive to the contractor cannot be made available).

• Demonstrate a baseline of information against which the project / package can be measured; this could be cost, program, quality or productivity related

• Demonstrate an ability to track changes associated with a project or package of work.

• Explain how over time the project has changed, this could include, but not limited to a review of program, commercial and/or team management.

• Demonstrate an in-depth knowledge of the project and subject areas you have selected to review

• Demonstrates the student has undertaken the activity over a period of time

• Create a well-structured report using good written English.

• Referencing as appropriate is included using the Harvard style

There are 3 videos to view. Here are the links. They are recorded 1 month apart and this is what is used to track these packages for this report

Vid 1:

Vid 2:

Vid 3: